For Linkbelt 8000Q Quantum Excavator, this reference brings together the listed operator’s manual material. Start with 2. CAUTION and follow the relevant document section for the task.
What’s Covered Inside
Hydraulic and Electrical Schematics
Manuals: Operators Manual
1. PREFACE
2. CAUTION
3. SAFETY
Warning Signs and Labels
Before Moving to the Job Site
Operation Practices
During Operations
During Traveling
On Completion of Daily Operations
During Transportation
Before Inspection and Maintenance
General Cautions for Inspection
OPERATION
Location of Components
Overall View
Operator’s Cab
Instruments and Controls
Right Console
Left Console
Heater and Air Conditioner
Monitor
Right Console Back Side
Operation Levers
Operator’s Seat
Operator’s Cab
Radio
Air Conditioner
Fuse
Battery
Manual Throttle Lever
Grease Pump
OPERATING INSTRUCTIONS
Cautions for Use of New Machine
Inspection Before Starting
Starting and Stopping the Engine
Warmup Operation
Operation Modes
Operation Instructions
Traveling
Swing
Attachment
Bucket, Turning Over and Replacement
On Completion of Daily Operations
Operating in Cold Climates
Operation under Special Conditions
Special Attachments[Breaker, Crusher, Hoisting Loads]Transportation
Removal and Installation of Counterweight
Lifting Machine and Major Parts
Extension and Refraction of Side Frames
Loading and Unloading
Storage
INSPECTION AND MAINTENANCE
General Cautions for Inspection
Precautions during Inspection
Rules for Inspection and Maintenance
Inspection and Maintenance Check List
Lubrication and Element Chart
Inspection before Starting
Periodic Maintenance
Greasing of Attachments
Fuel System
Engine
Bolt Torque
Hydraulic Oil
Battery
Upper Frame
Swing Unit
Travel Unit
Bucket
Air Conditioner
Periodic Replacement of Parts for Safety
Troubleshooting
Who to Contact for Problems
SPECIFICATIONS AND ETC.
Main Specifications
Electric Circuit Diagram
Hydraulic Circuit Diagram
Pressure Measurement and Adjustment
Manuals: Operators Manual
1. PREFACE
2. CAUTION
3. SAFETY
Warning Signs and Labels
Before Moving to the Job Site
Operation Practices
During Operations
During Traveling
On Completion of Daily Operations
During Transportation
Before Inspection and Maintenance
General Cautions for Inspection
OPERATION
Location of Components
Overall View
Operator’s Cab
Instruments and Controls
Right Console
Left Console
Heater and Air Conditioner
Monitor
Right Console Back Side
Operation Levers
Operator’s Seat
Operator’s Cab
Radio
Air Conditioner
Fuse
Battery
Manual Throttle Lever
Grease Pump
OPERATING INSTRUCTIONS
Cautions for Use of New Machine
Inspection Before Starting
Starting and Stopping the Engine
Warmup Operation
Operation Modes
Operation Instructions
Traveling
Swing
Attachment
Bucket, Turning Over and Replacement
On Completion of Daily Operations
Operating in Cold Climates
Operation under Special Conditions
Special Attachments[Breaker, Crusher, Hoisting Loads]Transportation
Removal and Installation of Counterweight
Lifting Machine and Major Parts
Extension and Refraction of Side Frames
Loading and Unloading
Storage
INSPECTION AND MAINTENANCE
General Cautions for Inspection
Precautions during Inspection
Rules for Inspection and Maintenance
Inspection and Maintenance Check List
Lubrication and Element Chart
Inspection before Starting
Periodic Maintenance
Greasing of Attachments
Fuel System
Engine
Bolt Torque
Hydraulic Oil
Battery
Upper Frame
Swing Unit
Travel Unit
Bucket
Air Conditioner
Periodic Replacement of Parts for Safety
Troubleshooting
Who to Contact for Problems
SPECIFICATIONS AND ETC.
Main Specifications
Electric Circuit Diagram
Hydraulic Circuit Diagram
Pressure Measurement and Adjustment
Use publication 914 with the 8000Q (Quantum Series) model details to select the appropriate documentation. Refer to 2. CAUTION within its stated document and equipment scope.




Reviews
There are no reviews yet.