For Linkbelt 6000Q SL, 6000Q RT SL Quantum Excavator, this reference brings together the listed operator’s manual material. Start with 1. OPERATING SAFETY and follow the relevant document section for the task.
What’s Covered Inside
Operators Manual: 84 pages (Tracked Scrape Loader)
Operators Manual: 88 pages (Rubber-Tired Scrape Loader)
Hydraulic and Electrical Schematics
Manuals: Operators Manual
1. OPERATING SAFETY
GENERAL SAFETY RULES
OPERATOR AWARENESS
MAGNET SAFETY INSTRUCTIONS
ELECTRICAL DANGERS
PROTECTIVE EQUIPMENT
SIGNALMEN AND BYSTANDERS
INSPECTIONS AND ADJUSTMENTS
AREA CLEARANCE
LEAVING THE STATION
2. OPERATOR’S CAB CONTROLS
RIGHT CONTROL CONSOLE
LEFT CONTROL CONSOLE
3. SYSTEMS CONTROL MONITOR
4. OPERATING SYSTEM CONTROLS
ENGINE THROTTLE CONTROL
JOYSTICK CONTROLLERS
SWING OPERATION
FREE SWING OPERATION
TO SWING THE UPPER
BOOM, ARM & JIB OPERATION (IF EQUIPPED)
ATTACHMENT CONTROL OPERATION
STEERING AND TRAVELING THE MACHINE
5. GENERAL OPERATION
MAGNET OPERATION
GRAPPLE OPERATION
6. HAND SIGNALS
7. CAB HEATER SHUTOFF VALVE
8. OPERATOR’S SEAT
9. ENTERING AND EXITING CAB
10. BREAK-IN PERIOD
11. BEFORE STARTING OPERATIONS
12. ENGINE STARTING PROCEDURE
TO START THE ENGINE
ETHER START
TO START THE ENGINE USING ETHER START
13. ENGINE SHUTDOWN
14. FUSE PANEL
15. FRONT WINDOWS
OPENING THE UPPER WINDOW
CLOSING THE UPPER WINDOW
REMOVING LOWER WINDOW
INSTALLING LOWER WINDOW
16. TRANSPORTING THE MACHINE
COUNTERWEIGHT REMOVAL/INSTALLATION
REMOVAL PROCEDURES
INSTALLATION PROCEDURES
ATTACHMENT REMOVAL/INSTALLATION
MACHINE LOADING AND UNLOADING
LOADING THE MACHINE
UNLOADING THE MACHINE
TILTING/LIFTING OF ELEVATED CAB
TILTING PROCEDURE
LIFTING PROCEDURE
17. MACHINE STORAGE
SHORT TERM STORAGE
LONG TERM STORAGE
ANTI-VANDAL GUARD
INSTALLATION
REMOVAL & STORAGE
Operators Manual: 88 pages (Rubber-Tired Scrape Loader)
Hydraulic and Electrical Schematics
Manuals: Operators Manual
1. OPERATING SAFETY
GENERAL SAFETY RULES
OPERATOR AWARENESS
MAGNET SAFETY INSTRUCTIONS
ELECTRICAL DANGERS
PROTECTIVE EQUIPMENT
SIGNALMEN AND BYSTANDERS
INSPECTIONS AND ADJUSTMENTS
AREA CLEARANCE
LEAVING THE STATION
2. OPERATOR’S CAB CONTROLS
RIGHT CONTROL CONSOLE
LEFT CONTROL CONSOLE
3. SYSTEMS CONTROL MONITOR
4. OPERATING SYSTEM CONTROLS
ENGINE THROTTLE CONTROL
JOYSTICK CONTROLLERS
SWING OPERATION
FREE SWING OPERATION
TO SWING THE UPPER
BOOM, ARM & JIB OPERATION (IF EQUIPPED)
ATTACHMENT CONTROL OPERATION
STEERING AND TRAVELING THE MACHINE
5. GENERAL OPERATION
MAGNET OPERATION
GRAPPLE OPERATION
6. HAND SIGNALS
7. CAB HEATER SHUTOFF VALVE
8. OPERATOR’S SEAT
9. ENTERING AND EXITING CAB
10. BREAK-IN PERIOD
11. BEFORE STARTING OPERATIONS
12. ENGINE STARTING PROCEDURE
TO START THE ENGINE
ETHER START
TO START THE ENGINE USING ETHER START
13. ENGINE SHUTDOWN
14. FUSE PANEL
15. FRONT WINDOWS
OPENING THE UPPER WINDOW
CLOSING THE UPPER WINDOW
REMOVING LOWER WINDOW
INSTALLING LOWER WINDOW
16. TRANSPORTING THE MACHINE
COUNTERWEIGHT REMOVAL/INSTALLATION
REMOVAL PROCEDURES
INSTALLATION PROCEDURES
ATTACHMENT REMOVAL/INSTALLATION
MACHINE LOADING AND UNLOADING
LOADING THE MACHINE
UNLOADING THE MACHINE
TILTING/LIFTING OF ELEVATED CAB
TILTING PROCEDURE
LIFTING PROCEDURE
17. MACHINE STORAGE
SHORT TERM STORAGE
LONG TERM STORAGE
ANTI-VANDAL GUARD
INSTALLATION
REMOVAL & STORAGE
Use publication 834 & 901 with the 6000Q (Quantum Series) model details to select the appropriate documentation. Refer to 1. OPERATING SAFETY within its stated document and equipment scope.




Reviews
There are no reviews yet.