For Liebherr R924 C Hydraulic Excavator Operators, this reference brings together the listed repair manual material. Start with Front page and follow the relevant document section for the task.
What’s Covered Inside
Service Repair Manual: 876 Pages
Operators Manual (SN after 31057)- 379 Pages:
Operators Manual (SN 26743 -31056): 387 Pages
Operators Manual (SN 23085: 26742) – 388 Pages
Operators Manual (SN 21026: 23084) – 378 Pages
PIN/Type: 1066, 1067, 1068,1069,1136,1174
Manuals: Operators Manual, Repair Manual
Table of Content – Liebherr R924 C Hydraulic Excavator Type 1066, 1067, 1068,1069,1136,1174 Manual
Front page
Contents
Introduction
1 General information
1.10: Safety instructions
1.20: Standards and regulations
1.50: Lubricants and operating fluids
1.60: Conservation guidelines
2 Tools
2.01: Special tools for maintenance and repair
2.02: Special tools for Liebherr Diesel engines
2.03: Special tools for the hydraulic system
2.06: Special tools for electrical connectors
2.07: Special tools for gears
2.08: Common tools
2.10: Measuring tool for spool travel
2.12: Mounting tools for hydraulic cylinders
2.14: Wrench for the slotted nut on the swing gear SAT
2.15: Compression device for brake piston of gear SAT
2.17: Compression device for brake piston of gear FAT – construction line P(b)
2.19: Calibration values for LMS system
2.22: Tools for installing the slipring seals
3 Technical data / Maintenance guidelines
3.10: Technical data
3.12: Technical data
3.50: Control and maintenance chart
3.70: Lubrication chart
4 Engine / Motor
4.10: Technical data for LIEBHERR Engine Type: D 934 S A6
4.26: Installation and check list for Diesel particle filter
4.27: Liebherr Diesel particle filter (accessory kit)
4.40: Datalogger
5 Coupling / Splitterbox
5.10: Coupling
5.30: Pump distribution gear – construction line DPVP
6 Hydraulic system
6.63: Adjustment Check List
6.64: Adjustment Check List
6.68: Load Sensing Control
6.69: Layout of hydraulic system
6.80: Hydraulic Schematics – Components List
6.90: List of hydraulic schematics – Standard executions
7 Hydraulic components
7.01: Hydraulic pump: Removal, installation, Start-up.
7.11: Variable-displacement twin pump DPVP
7.20: Hydraulic motors schedule
7.25: HMF 75-02P hydraulic fixed-displacement motor
7.30: Hydraulic cylinders
7.31: Extension and retraction speeds
7.32: Installations for pistons and piston nuts by hydraulic cylinders
7.38: Hydraulikzylinder – R 914 C / R 924 C
7.45: Control oil and control unit
7.50: 1-way servo control
7.51: 2-way servo control
7.55: 4-way servo control (Rexroth)
7.56: Hydraulic pilot control device with 2 pedals and damping system
7.61: Control valve complete
7.62: Control plate
7.64: Inspecting the control valve blocks for leak oil
7.75: 1-way rotary connection
7.77: 5-way rotary connection
7.79: 7-way rotary connection
7.97: Brake valve for hydraulic travel gear motor
8 Electrical system
8.10: Construction of the electrical system
8.30: Monitoring display
8.40: Control unit S2
8.80: Component list – Electrical diagrams
8.90: List of electrical diagrams – Standard execution
9 Swing gear
9.10: Swing gear «SAT»
9.20: Swing gear brake
10 Swing ring
10.10: Ball slewing ring
11 Travel gear
11.10: Gear types schedule
11.15: Technical data of the travel gears
11.25: Travel gear FAT of construction line P(b)
11.50: Sealing the gear – construction line P(b)
11.71: Travel brakes
11.75: Slipring seals
12 Track components
12.10: Track components of crawler excavators
12.20: List of the track components on R 914C – R 924C
12.30: Wear on the track components
12.32: Wear limits for chains
12.35: Wear limits for rollers
12.38: Wear limits for guide & sprocket wheels
12.40: Dismantling and installing track components
12.52: Tension units – Technical data
12.56: Tension unit with single spring loose
12.58: Grease tensioner and guide wheel unit
12.70: Track roller
12.75: Carrier roller (supported on one side)
12.80: Slipring seals
16 Options
16.02: Load holding valves for Hoist Cylinders
16.20: Hydraulic installation kit AHS 11 with Tool Control
16.24: Hydraulic installation kit AHS 12 with Tool Control
16.30: Refuelling pump
16.91: List of diagrams
16.92: List of diagrams
Hydraulic schematic
Electrical schematic
(Page -1)
17 Cab / Heater / Air conditioning system
17.30: Auxiliary heating
17.50: Heating and air-conditioning system
18 Central lubrication
18.50: Lube hoses repair instructions
18.51: Centralized lubrication system
18.56: Pump of the centralized lubrication system
18.58: Progressive distributor SX-E
18.59: Progressive distributor MX-F
Match the R924 C application and the individual document details before using this repair manual. Refer to Front page within its stated document and equipment scope.






Reviews
There are no reviews yet.