For Case 350, 400, 450, 600 Steiger Tractor, this reference brings together the listed repair manual material. Start with Engine and follow the relevant document section for the task.
What’s Covered Inside
Manuals: Service Manual
Introduction
Engine
Transmission
Front Axle System
Rear Axle System
Power Take Off (PTO)
Brakes and Controls
Hydraulic Systems
Hitches, drawbars and implement couplings
Frames and ballasting
Steering
Wheels
Tracks and Suspension
Cab Climate Control
Electrical System
Platform, cab, bodywork and decals
Special Tool Index
Manual Extract: Receiver/Dryer – Static description
The receiver/drier orientation is critical. Make sure the outlet flange is within 5 ° of true level (the decal should face up).
The receiver/drier must be installed with the inlet connected to the hose from the condenser and the outlet connected to the hose going to the thermal expansion valve.
The receiver/drier is normally the last item replaced when servicing the system, just before the system is evacuated.
This prevents saturating the drier with moisture.
When servicing the receiver/drier, use the two hand, two wrench method to prevent damage to the tubes and fittings when you loosen or tighten the tube connections.
Always install new O-rings when the receiver/drier is connected to the system. Lubricate the O-rings with clean mineral oil prior to installation.
Introduction
Engine
Transmission
Front Axle System
Rear Axle System
Power Take Off (PTO)
Brakes and Controls
Hydraulic Systems
Hitches, drawbars and implement couplings
Frames and ballasting
Steering
Wheels
Tracks and Suspension
Cab Climate Control
Electrical System
Platform, cab, bodywork and decals
Special Tool Index
Manual Extract: Receiver/Dryer – Static description
The receiver/drier orientation is critical. Make sure the outlet flange is within 5 ° of true level (the decal should face up).
The receiver/drier must be installed with the inlet connected to the hose from the condenser and the outlet connected to the hose going to the thermal expansion valve.
The receiver/drier is normally the last item replaced when servicing the system, just before the system is evacuated.
This prevents saturating the drier with moisture.
When servicing the receiver/drier, use the two hand, two wrench method to prevent damage to the tubes and fittings when you loosen or tighten the tube connections.
Always install new O-rings when the receiver/drier is connected to the system. Lubricate the O-rings with clean mineral oil prior to installation.
Use publication 47488212 (Feb 2013) with the 350, 400, 450, 600 Steiger model details to select the appropriate documentation. Refer to Engine within its stated document and equipment scope.










Reviews
There are no reviews yet.