For Case DV210 Vibratory Roller, this reference brings together the listed repair manual material. Start with Machine Completion and Equipment and follow the relevant document section for the task.
What’s Covered Inside
Introduction
Machine Completion and Equipment
Engine
Hydrostatic Drive
Hydraulic System
Frames and Ballasting
Steering
Wheels
Cab Climate Control
Electrical System
Platform, Cab, Bodywork and Decals
Manual Extract: Pump – Adjust vibration frequency
To adjust vibration, first check and, if necessary, adjust the engine’s max RPM.
1. Check frequency values with the roller at standstill, and placed on an engine bench, or on tires laid down or on soft ground at max engine speed (adjusted to 2290 RPM).
2. Position the measuring instrument probe onto the drum jacket.
3. Switch ON vibration only on the drum being measured.
NOTICE: The max. total time of vibrator run with no drum turning over (bearing lubrication) is two minutes!
NOTE: Alternatively, you can position the measuring instrument probe on the damper plate. When measuring this way, you may read (pick up) vibrator frequency during machine drive.
4. Use Allen screws ( (1), low amplitude) and ( (2), high amplitude) to adjust the frequency after having slackened the lock nut (counter-nut) of the vibration pump ( (6), for front drum), ( (7), for rear drum) with the engine turned off.
5. Slacken (counter-clockwise turning) to increase the frequency and tighten (clockwise turning) to decrease the frequency.
6. Start the engine.
7. Check the set value again with the engine running
Use publication 47703709 (Sep 2015) with the DV210 model details to select the appropriate documentation. Refer to Machine Completion and Equipment within its stated document and equipment scope.












Reviews
There are no reviews yet.