For Case 888 Excavator, this reference brings together the listed repair manual material. Start with General and follow the relevant document section for the task.
What’s Covered Inside
General
Engines
Fuel System
Electrical
Track and Suspension
Power Train
Brakes
Hydraulics
Mounted Equipment
Manual Extract:
Engine Lubrication
Fill the engine crankcase with CD service classification oil that has the correct viscosity rating for the ambient air temperature. Refer to Engine Lubrication on page 8. Install new oil filters, after the engine has been rebuilt.
Run-In Procedure For Rebuilt Engine
STEP 1 Disconnect the wire to the electric shut-off on the injection pump so that the engine will not start. Crank the engine for 30 seconds until there is oil pressure, then reconnect the wire.
STEP 2 Remove the air from the cooling system at the temperature sending unit.
STEP 3 Run the engine at 1000 rpm minimum load for 5 minutes and check for oil leaks.
STEP 4 During the Run-In, continue to check the oil pressure, coolant level, and coolant temperature.
Run-In Procedure For Rebuilt Engine (With A Dynamometer)
The following procedure must be followed when using a PTO dynamometer to Run-In the engine. The dynamometer will control the engine load at each speed and will remove stress on new parts during Run-In.
Use publication 8-88642 (June 1990) with the 888 model details to select the appropriate documentation. Refer to General within its stated document and equipment scope.










Reviews
There are no reviews yet.