The Case 750M crawler-dozer service listing covers maintenance, engine, drive, brake, hydraulic, track, electrical and blade-system topics. Its lower-track-roller sample describes lubricant filling after a referenced leakage test.
Document Details
Manuals: Service Manual
Contents Listed
Contents
Introduction
Maintenance
Engine
Power Coupling
Hydrostatic Drive
Brakes and Controls
Hydraulic Systems
Hitches, drawbars and implement couplings
Tracks and Track Suspension
Cab Climate Control
Electrical System
Lubrication System
Dozer Blade and arm
Tools
Platform, cab, bodywork and decals
Specials Tool Index
Electrical Schematics
Hydraulics Schematics
Procedure Excerpt
Manual Extract: Track roller Lower roller – Filling
Prior operation:
Track roller Lower roller – Leakage test (48.138).
1. Turn the shaft so that the mounting surface of the end cap is down and the filler opening is up.
2. Fill the roller with the lubricant, refer to Capacities.
3. Connect an air line that can be controlled to a maximum pressure of 275 kPa, 2.7 bar (40 psi) to the filler hole.
4. Open the valve for the air line to push the lubricant into the outer ends of the roller.
5. Close the valve and disconnect the air line from the roller.
6. Check the oil fill volume by positioning the roller so the oil fill hole is at the top of the roller.
7. Insert a dip stick into the oil fill hole until it contacts the tip of the roller or the idler shaft.
8. The dip stick should read an oil volume level of 5.0 to 8.0 mm (0.195 to 0.315 in) above the top of the shaft.
9. Install and tighten the plug.
Match the machine model and publication reference before using the manual. Read the procedure excerpt within its complete manual section, including the referenced precautions and specifications.










Reviews
There are no reviews yet.