For Case 1000D Crawler Dozer, this reference brings together the listed repair manual material. Start with SERIES/SECTION and follow the relevant document section for the task.
What’s Covered Inside
SERIES/SECTION
10 SERIES – GENERAL
20 SERIES – ENGINE
30 SERIES – FUEL SYSTEM
40 SERIES – HYDRAULICS
50 SERIES – TRACK AND SUSPENSION
60 SERIES – POWER TRAIN
80 SERIES – ELECTRICAL
90 SERIES – MOUNTED EQUIPMENT
Manual Extract PUMP INSTALLATION AND TIMING
The Case Crawler is equipped with a three stage filtering system connected in series. The primary stage unit is a metal-edge type cleanable filter to remove the heavier particles from the fuel. The secondary stage has a replaceable element capable of removing practically all of the fine abrasives which pass through the first stage. The final stage filter is a sealed and non-cleanable unit located immediately before the injection pump and capable of removing particles of 2 microns.
Clogging or excessive deposits of contaminants on filter elements causes insufficient fuel flow and necessitates periodic replacement. Generally, the flow is restricted too much when a vacuum of 10″ or more is present on the suction side of the pump. A tee fitting is provided on the pump inlet for insertion of a vacuum gauge to check the efficiency of the filters . Clean the primary filter if the reading is too high. I f the reading is still too high, replace the element in the secondary filter. If the reading does not come down, the final stage filter must be replaced. If the primary and secondary filters are properly maintained and doing their job, it should not be necessary to replace the final stage filter for a long time .
Use publication 9-72142 (Dec 1976) with the 1000D model details to select the appropriate documentation. Refer to SERIES/SECTION within its stated document and equipment scope.










Reviews
There are no reviews yet.